top of page

Upgrading an existing ship conveyor belt.



The Heavy Industry Department of SABO carries out construction and installation operation of the mechanical equipment regarding the ship’s conveyor belt at the Lafarge Beton facility which located in Milaki.


Within the context of the development of the company’s activities and with the aim of ensuring the possibility of loading larger ships, Lafarge Beton cooperates with SABO S.A. for the necessary constructions and operations.


SABO’s department has undertaken:

  • the construction of the metal scaffolding,

  • the modifications to the conveyor belt and

  • the commissioning of the equipment.

The operations are carried out qualified and experienced personnel, following the highest safety standards.


bottom of page